Initial site and preparation
Phase 1
Phase 2 with lower retaining wall to support the landing
Every stone was shaped on-site by hand.
Stone sitting bench incorporated in the retaining wall
Job complete with stone walkway
Initial site and preparation
Phase 1
Phase 2 with lower retaining wall to support the landing
Every stone was shaped on-site by hand.
Stone sitting bench incorporated in the retaining wall
Job complete with stone walkway